Main achievements in Title
Power Plant
Clients | Projects | Period |
---|---|---|
Korea South-East Power Co. | Power generator material quality inspection consignment service | 2022.11 - 2024.02 |
Korea District Heating Corporation | Material Inspection Service for Collective Energy Facility Construction in 2022 | 2022.05 - 2024.05 |
Lotte E&C | Daegu/Cheongju Eco-Friendly Energy Improvement Project Outsourcing Service | 2022.04 - 2024.04 |
Korea South-East Power Co. | Power generator material quality inspection consignment service | 2022.01 - 2022.11 |
Doosan Enerbility | 2021~2022 Third Party Inspection (TPI) Quality Services Overseas/Domestic Inspection Unit Price Contract | 2021.06 - 2022.12 |
Korea District Heating Corporation | 2020 Construction Project Material Inspection Services in Seongnam, Pyeongtaek, and Yangsan |
2020.05 - 2022.04 |
Korea South-East Power Co. | Power generator material quality inspection consignment service | 2020.01 - 2021.01 |
Doosan Heavy Industries |
Nghi Son 2 thermal power plant project (Vietnam) : 665MW x 2 |
2019.09 - 2020.12 |
Doosan Heavy Industries |
2019~2021 Third Party Inspeciton Overseas/Domestic Inspection Quality Services |
2019.06 - 2021.05 |
Korea South-East Power Co. | Entrusted with quality inspection of power generation equipment |
2018.01 - 2019.01 |
Doosan Heavy Industries | Fadhili CCPP (Saudi Arabia) : 1,519MW |
2017.04 - 2019.03 |
Doosan Heavy Industries | Karabatan CCPP (Kazakhstan) 310MW | 2017.02 - 2017.09 |
Samsung C&T |
Algeria Mostaghanem CCPP (1460MW) |
2017.01 - 2017.12 |
Samsung C&T |
Algeria Naama CCPP (1163MW) |
2017.01 - 2017.12 |
Korea Hydro & Nuclear Power | Shin-Kori Units 5 and 6 Equipment Quality Inspection Service |
2016.08 - 2024.06 |
Hyundai Engineering | Rajamandala Hydroelectric Power Plant (Equipment Inspection) |
2016.04 - 2017.05 |
Doosan Heavy Industries | Vinh Tan 4 TPP (Vietnam) : 600MW x 2 |
2016.03 - 2018.05 |
Daewoo E&C |
Youngnam Combined Cycle Power Plant Project (470 MW) |
2016.01 - 2018.12 |
Daewoo E&C | Combined Thermal Power Project (1320 MW), Safi, Morocco | 2016.01 - 2018.12 |
Samsung C&T |
Qatar Umm Al Houl Power Plant PJT (2500MW) |
2016.01 - 2016.12 |
Samsung C&T |
Saudi Rabigh-2 independent power project (2060MW) |
2016.01 - 2016.12 |
Daewoo E&C | Combined Thermal Power Project (940MW) Pocheon | 2016.01 - 2016.12 |
Korea South-East Power Co. | Entrusted with quality inspection of power generation equipment |
2015.04 - 2016.04 |
Hyundai Engineering |
Therma Visayas Energy Project Biskra 1600MW Combined Cycle Power Plant Project |
2014.12 - 2016.06 |
Samsung C&T |
Algeria Naama Combined Cycle Power Plant Project |
2014.12 - 2015.12 |
Samsung Engineering |
Saudi Aramco Cogeneration Project (Sponsor : Saudi Aramco, Marubeni/JGC/Aljomaih) |
2014.03 - 2015.06 |
Gas, refineries, and petrochemical plants
Clients | Projects | Period |
---|---|---|
Lotte E&C | LOTTE Chemicals ES PJT Equipment Inspection Service | 2022.09 - 2023.12 |
Lotte E&C | Indonesian LINE Project WP5&7 (Headquarters) Equipment Inspection Services |
2022.06 - 2024.06 |
Lotte E&C | Indonesian LINE Project WP3 (Headquarters) Equipment Inspection and Coordinator Dispatch Services |
2022.06 - 2024.11 |
Hyundai Engineering | PKN ORLEN OLEFINS EXPANSION PROJECT | 2022.04 - 2023.06 |
SAE-A STX ENTECH | Iraq BP PWRI and Lukoil Flare System Project Equipment Inspection Services |
2020.04 - 2022.03 |
SINOPEC | Replacement of Uniflux Heaters at MMA Refinery |
2019.07 - 2021.09 |
Samsung Engineering | Technical support/inspection services for equipment on a project-by-project basis |
2018.03 - 2020.04 |
FDH JV - Fluor Ι Daewoo E&C Ι HHI |
KNPC ZOR PJT_FDH JV 3rd party inspection service | 2016.10 - 2022.06 |
FDH JV - Fluor Ι Daewoo E&C Ι HHI |
Kuwait National Petroleum Company K.S.C. Al-Zour Refinery Project Package #2,3 | 2016.10 - 2022.06 |
HSS JV - HDECㅣSK E&CㅣEIFFAGE |
Kuwait National Petroleum Company K.S.C. Al-Zour Refinery Project Package #5 | 2016.08 - 2020.03 |
HSS JV - HDECㅣSK E&CㅣSaipem |
Al-Zour Refinery Prjoect Packgae #5 |
2016.08 - 2019.06 |
Korea District Heating Corporation | 2016 Double Insulation Pipe Purchase Unit Price Contract Resident Inspection Services |
2016.08 - 2017.10 |
Daewoo E&C | S-OIL RUC Project | 2016.01 - 2018.12 |
PSC JV - Petrofacㅣ SamsungㅣCB&I |
Clean Fuels Project - MAB1, Kuait Third Party Inspection service |
2015.07 - 2019.03 |
Hyundai Engineering | Lotte Versalis Elastomers Special Rubber Project |
2015.04 - 2016.06 |
FDH JV - Fluor Ι Daewoo E&C Ι HHI |
Kuwait National Petroleum Company K.S.C. CFP MAB2 Project |
2015.03 - 2018.09 |
Daewoo E&C |
Equipment Inspection Personnel support/inspection service |
2015.01 - 2020.12 |
Hyundai Engineering |
Indonesia Asahimas Phase-IV Project |
2014.10 - 2015.12 |
Samsung Engineering | Azerbaijan SOCAR Ammonia and Urea Complex Project |
2014.10 - 2015.07 |
Samsung Engineering |
Bolivia YPFB Ammonia and Urea Project |
2013.08 - 2015.07 |
Hyundai Engineering | Thailand Linear Alkyl Benzene Project | 2013.08 - 2015.03 |
Steelmaking and industrial plants
Clients | Projects | Period |
---|---|---|
YUNSUNG F&C | Quality Inspection Services Contract | 2022.02 - 2023.02 |
SK Specialty | 3rd Party Inspection Services for Fixed Equipment Site Inspection |
2021.07 - 2022.12 |
SK Showa Denko | 3rd Party Inspection Services for Fixed Equipment Site Inspection |
2021.07 - 2022.12 |
Hyundai Steel | Production Management Verification Services (2020-2021) | 2020.02 - 2021.12 |
Korea Water Resources Corporation | 2021 Han River Basin Protective Relay Facility Performance Diagnosis Services |
2021.05 - 2021.11 |
Samsung Engineering | [S3-V Lower Finish] Quality Management Services | 2020.11 - 2021.07 |
[Ultra-Pure Retrofit] Quality Management Services | 2020.05 - 2021.12 | |
Hyundai Rotem | Boryeong #1-8 Coal Handling Facilities Maintenance Project | 2016.11 - present |
Hyundai Steel | Production Management Verification Services | 2020.02 - 2021.12 |
SAE-A STX ENTECH |
POSCO (Pohang and Gwangyang) Thermal Power Plant 3rd Party Inspection - NOx Removal Capacity Enhancement SCR Facility Project Service contracts |
2019.02 - 2022.04 |
3rd Party Inspection Services - Boryeong Power Plant Unit 3 Environmental Facilities (Deaeration, Dust Collection, Desulfurization) Purchase and Installation Project |
2018.08 - 2019.08 | |
Hyundai Steel | Production Management Verification Services (2018) 2nd Phase | 2018.07 - 2018.12 |
Korea Water Resources Corporation | K-water Han River Area Protective Relay Performance Diagnosis Services |
2018.06 - 2018.12 |
Samsung Engineering | Retrofit Quality Management Services | 2018.03 - 2020.04 |
Hyundai Steel | Production Management Verification Services (2018) | 2018.01 - 2018.12 |
POSCO PLANTEC | Equipment Inspection Service | 2017.10 - 2023.09 |
Hyundai Steel |
C Hot Rolled Coil Line Project (#5SPM) |
2014.07 - 2016.01 |
2 Cold Rolled Coil Line Project (#2CGL) |
2014.07 - 2016.01 | |
Hanmi Global |
P-PJT (Technical Service for Welding Procedure Qualification) |
2013.10 - present |
Hyundai Steel | Dangjin 1 Steel Plant Units 1-3 | 2008.01 - 2013.12 |